Search Blog

Loading
Showing posts with label testing. Show all posts
Showing posts with label testing. Show all posts

Thursday, 21 August 2008

Test Managers – Balance of Opinions

I am sure that most of the readers of the blog will instantly know what I mean when I say that different Test Managers arrive at different decisions. There can be many reasons for this, some are harder than others, some are nicer than others, some come from one country and some from another, some are permanent, some are supplied and some are contract, some are new to role, some are new to the organisation.

The reality is that people are different and our experiences drive us to behave in certain ways. To some extent those that know us well will predict our reactions and actions. When running a department full of Test Managers and having a mix of personalities and capabilities, it becomes important to bring some balance or levelling to this. You don’t want Test Managers to be sought because the project will always go live.

This means that we need to turn some of those decision making activities into more of a science and remove the imbalance that can be introduced by emotion or experience. I can’t really supply you with facts and figures to enable you to draw a decision diagram, because it is not that easy. But I will try and point you in what I think is the right general direction.

I would start by breaking down the departments testing functions into business domains. It is more likely that you can assess what is being released in terms of quality at domain level as a starting point. For instance, when releasing to the web you experience a high degree of success and few calls for support, yet when compared to releasing in Business Intelligence, the quality is always an issue and the first run of the month end batch processes always crashes. This gives an indication of where to start defining some criteria. But there are other areas to be considered as well. It could be that one development agency has a far higher success rate than another, where the volume of defects found are always low, or perhaps when a development agency or department develop using a particular language, the results are always much better than others.

These different criteria can be used to form some basic rules around final exit criteria for instance, enabling decisions to be made within a set range, ensuring that all Test Managers reach the same conclusions. Perhaps looking at the ratio of defects to scripts and comparing this to some analysis on the application being developed, the language of development, volume of calls pertaining to the application in support and the domain of release would provide good statistical evidence for decision making criteria.

Basically I am suggesting that you use historical data to form basic guidelines that the Test Managers can use. It does not necessarily eradicate the problem, but at least it will enable easy identification of projects that are outside of the norm. The Test Manager must still have the power to state what they think, even if this flies in the face of the statistical evidence, but when doing so they should be able to substantiate their view.

For projects running with inexperienced Test Managers or those that are inclined to shy away from awkward decisions, the decision becomes one of science which in most cases is going to be correct.

Tuesday, 19 August 2008

Empowered Test Managers

The test function plays an important part within an organisation, yet too often they are asked to work in a manner which is restrictive and fails to give them the authority or accountability that they require or deserve. Strangely in some instances, even when they are given the authority they fail to take it.

So let’s look at the Test Completion Report. This is the opportunity for the Test Team to give a full account of what has occurred during the testing and make any recommendations. Why is it then, that we do not include as a standard within every report, a recommendation on whether the item is suitable for release into production. Part of the answer may be that the Test Manager does not feel comfortable stepping away from the black and white of scripts passing and failing and the associated defects would appear to make some uncomfortable. But the Test Manager knows the testing which was due to occur, understands how much has occurred and what level of quality has been achieved. Why then is it felt that this is not a logical and calculated recommendation.

On the flip side, why are Application Support departments not demanding proof of testing and a solid opinion on the level of quality that has been achieved? In most organisations, if a poor quality product is released to production, it is not the members of the project that are impacted by the problems, but those in Application Support. Not only are they going to be receiving calls through to the Service Desk, they are potentially going to be calling out support staff in the middle of the night to recover from the problems. Not only this, but any service levels that the Application Support department are supposed to maintain are potentially being compromised. It is therefore imperative that these two departments work together. It is often the case that Application Support will have more clout within the organisation and will therefore be able to assist in the move to a more authoritative testing department.

Another area that the Test Manager should be given more authority is on the exit of Integration in the Small and the entry of Integration in the Large. Two important events occur here. The first is the handover of the development agency’s testing assets and proof. A failure to provide this information is a red flag to the Test Manager and should sound all sorts of alarm bells. This is indicative of a lot of problems about to be experienced during test execution. The second is when the code is first delivered into testing and the process of running those first few scripts. If these start to fail then there is a second indication of problems with quality. Yet so often the Test Manager is not in a position of authority to insist on the production of test assets from development, or indeed to bounce the code back for rectification of defects. If the Test Manager is engaged at the outset of the project, they should be able to insist on the supply of test assets from development. To avoid the problems of poor quality code delivered, take smaller drops of code and start them sooner, so that an indication of quality is understood, or add a specialist phase of testing prior to Integration in the Large, where the sole purpose is the sign off of the code quality delivered, potentially by smoke/sanity testing the application using a selection of the scripts created.

To summarize, ensure that the opinion of the Test Manager is sought. Don’t let them get away with a statement of scripts run and defects raised, open and closed in the Test Completion Report. Insist that they provide an opinion. Work with Application Support to bring additional credibility to the department. Once this has been achieved you can then start to think about how you ensure that all of the Test Managers in a department apply the same level of reasoning when making recommendations for go live. The subject of another article I think.

Friday, 15 August 2008

SOFTWARE TESTING GLOSSARY (Update)

This glossary is a living post – so will be edited as we come across terminology that is not included. If you have any suggestions or disagree with an explanation, drop us an e-mail and let us know. TCL India offer this as a means of establishing glossaries of your own or as a point of reference. This update includes 10 new definitions.

A…………………………………………………………………………………………………

Accessibility: (Testing)Looks at an application to ensure that those with disabilities will be able to use the application as an able individual.
Agile: A development method, involving the creation of software, with the contributing parties, including testing, all working on the same item at the same time.
Alpha: (Testing)Testing of an application which is in production, but not available for general use. This is normally performed by users internal to the business.
Analyst: Person who interacts with the business in order to understand and document their requirements for an application or change to an existing one.
Analyst (Test): Person responsible for the preparation and execution of test scripts, recording and progressing of defects, reporting into the Test Team Leader or Test Manager.
Automation: The process of developing a script or program which can be run by software rather than a Test Engineer, to test an aspect of an application. Automation is used to increase the speed of test execution.
B……………………………………………………………………………………………………

Beta: (Testing)Testing of an application which is in production, but not available for general use. This is normally performed by a select group of friendly external testers.
Black Box: The process of testing without understanding the internal workings of an application, relying on inputs and outputs only.
Bug: See DefectBusiness Requirement Specification: See Requirement Specification

C……………………………………………………………………………………………………

Case: See ScenarioCode: The software that has been produced by development and is being subjected to testing.
Completion Report: A document produced during the testing and presented to the project manager on completion of testing activity. The document should detail the tests that have been performed along with the associated results and defects. Some reports may include a recommendation for the applications suitability for release to production.
Component: The smallest item that is testable or producible. This often refers to a single file of code.
Configuration Management: The means of managing the components required to make a larger item. Applicable to files, documents, data, hardware, software, tools. Understanding of the versions of each component required in order to be able to re-build the larger item.
Criteria: See Entry Criteria and Exit Criteria

D……………………………………………………………………………………………………

Data: Information pertaining to the use of a system or recorded through the use of a system. Data is used in order to test a system, potentially after data cleansing if personal information is involved.
Data Generator: A tool used to generate high volumes of data in order to be able to test many permutations, or to load test an item.
Data Protection Act (DPA): The act that determines how personal data should be used and protected from abuse.
Data Scrambling: The process of altering personal information from data to be used for testing purposes.
Defect: Where the item under test has been found to inaccurate, resulting from testing. Primarily used in associated with software, but equally valid for static testing of documentation.
Defect Detection: The means of identifying a defect. Can be a metric used to predict the volume of defects expected during the course of a project, or as a means of looking back at a project to understand where testing needs to be concentrated in future projects of a similar nature.
Defect Removal Efficiency: A metric used to assess the ability of testing to remove defects as they are introduced, during the software development life-cycle, keeping the cost of testing later phases to a minimum.
Defect Turnaround: The time taken from the identification of a defect, through to the point of resolution. Different levels of granularity may be used. e.g. A focus on the time taken by development.
Developer: A person responsible for the development of an application.
Development: A process of producing an application by production of low level design, code, unit testing and integration in the small testing.
Dynamic: Testing which occurs on the right hand side of the V-model, with the application present.

E……………………………………………………………………………………………………

Environment: The combination of hardware, software and data as used in development, testing and production. The platform/s upon which the testing occurs.
Entry Criteria: The criteria that must be met prior to a deliverable entering the next phase of testing to another. This is normally associated with documented test assets and pre-agreed volumes of defects.
Error: See Defect
Exit Criteria: The criteria that must be met prior to a deliverable leaving the current phase of testing. This is normally associated with documented test assets and pre-agreed volumes of defects.
Execution: The process of working through a script on the application under test, in the testing environment.

F……………………………………………………………………………………………………

Functional: (Testing) The testing of a products function, against requirements and design.
Functional Specification: A document which extracts all of the functional requirements from the requirement specification.

G……………………………………………………………………………………………………

Glass Box: See White Box
Grey Box: Testing performed by testers with some knowledge of the internal workings of an application. See also Black Box and White Box testing.

H……………………………………………………………………………………………………

High Level Design: A design showing the major components and how these will interface to each other, defining the hardware to be used and the software that will be impacted.

I…………………………………………………………………………………………………… 


Integration in the Large: Where the application or applications that have been developed are brought together along with those which have remained unchanged, building a production like system around the application/s. Testing is then applied looking at the communication between the different applications.
Integration in the Small: Where the components of the application that have been developed are brought together along with those which have remained unchanged, building the application or major component of a single application. Testing is then applied looking at the communication between the different components.Integration: The act of bringing many parts together to form a whole.
ISEB: Information Systems Examination Board. This was historically the board that was used to certify test professionals at either Foundation (Entry Level) or Practitioner Level (Advanced). See:http://www.bcs.org/server.php?show=nav.5732
ISTQB: International Software Testing Qualifications Board. See:http://www.istqb.org/

J…………………………………………………………………………………………………….
K……………………………………………………………………………………………………


Key Performance Indicator: A mechanism built on one or metrics, which determines a band of acceptable performance, which over time is often targeted towards improvement.

L……………………………………………………………………………………………………

Live: See Production
Load: One of the types of performance testing, this looks at testing for the maximum load on the system.
Load Runner: Tool used to performance test one or many applications, to understand how it handles increases in load. See:https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-15-17%5e8_4000_100__
Low Level Design: Definition of exactly how the application/s will be modified or produced in order to meet the requirements and the high level design. This can extend in some examples to elements of pseudo code being defined.

M……………………………………………………………………………………………………

Metric: A measure of an attribute or occurrence in connection with an organisation, department or functions performance.

N……………………………………………………………………………………………………..

Non-functional: How an application performs, rather than how it does it.
Non-functional Specification: A document which details the non-functional requirements such as performance, security, operational elements.

O……………………………………………………………………………………………………
P……………………………………………………………………………………………………


Performance Centre: A tool used for measuring the performance of an application or series of applications. See:https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-126-17_4000_100__
Performance: Used to describe many types of testing relating to the speed of an application. See Volume, Load and Stress.
Plan: A document produced for a type of testing defining how the testing will be performed, when the testing will be performed and who will be performing it. The test plan lists the test scenarios that will be scripted.
Preparation: The process of generating the test scripts.
Prince2: A project management methodology that is used amongst a lot of blue chip organizations to bring discipline to the software development life cycle.
Priority: The importance of fixing a defect from a business perspective. Defined by business representatives.
Production: The area or a computer network that contains applications which are in use by real users and contains real data. The area that applications are released to on completion of a project.

Q……………………………………………………………………………………………………

Quality: The suitability of an item for its intended purpose and how well it achieves this.
Quality Centre: Tool used to assist with the management of testing, recording and tracking scripts, logging and tracking defects and more. See:https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-127-24_4000_100__

R……………………………………………………………………………………………………

Regression: Retesting of a previously tested program following modification to ensure that faults have not been introduced or uncovered as a result of the changes made.
Requirement Specification: A document normally produced by a business analyst, capturing the needs of the individual in a manner which means that they can be translated into a software solution.
Re-Test: Taking a defect which has failed and executing the associated test script again.

S……………………………………………………………………………………………………

Safety Critical: Used to identify something for which the use has an impact on personal safety, such as medicinal applications or those used by rescue services.
Scenario: A high level description of how a requirement is going to be tested.
Script: Referable back to the scenario, the script defines each step that must be passed through in order to perform a test, along with the expected results. As the script is executed, results are recorded and if they match the expected result are marked as passed, otherwise as failed. A script containing a failure should have a resultant defect raised.
Schedule: A document, similar to a project plan, but detailing the activities associated with testing, when they are due to occur and who will be performing them.
Severity: The importance of a defect to testing and the application. Defined by Testers
Special Interest Group In Software Testing (SIGIST): A group that has been set up by the British Computer Society, made up of people interested in the subject of software testing.
Smoke: A process of proving an application or environment is ready to commence full testing, by running a sample set of scripts testing the primary functionality and/or connectivity.
Software Development Life Cycle (SDLC): The process of taking a requirement and translating it into a fully working application.
Static: The process of testing without the presence of software. Normally refers to the testing of documentation.
Strategy: A document produced at project or programme level, defining what testing is to be performed.
Stress: A form of performance testing, whereby the volume of testing is increased to a point at which the application is deemed to be failing to perform, either due to failure to meet performance criteria or system breakdown.

T……………………………………………………………………………………………………

Technical Architecture Document: Definition of how the business requirements should be translated into a technical solution at the highest level.
Test Bed: A cumulative term used for all of the test environments used by the test department.
Test Director: A tool used for test management, capture of requirements, scripts and defects, with the ability to manage defects through to resolution. Now replaced by Quality Centre.
Test Maturity Model (TMM): A means of measuring a testing department’s level of maturity in a similar manner to that of the capability maturity model (CMM).
Testing: The process of reviewing an item for accuracy and its ability to complete the desired objective.

U……………………………………………………………………………………………………

Unit: The testing of the application by the developers at a component or modular level, looking at whether the code is performing as expected.
User Acceptance: The means of testing applied, normally by members of the business or recipients of the system, whilst still in the test environment. This looks to ensure that business requirements have been understood by all involved in the application production as well as providing an opportunity to check the business processes that the application will be used in conjunction with.

V……………………………………………………………………………………………………

V-Model: A testing focussed software development life-cycle where the process of creativity occurs down the left side of the V and the process of testing up the right side of the V, where each step down the V has a corresponding point of testing up the right of the V. Begins with a requirement and terminates with User Acceptance Testing.
Version: An alpha numeric means of identifying a particular build of software, or a component thereof. The version changes incrementally to reflect each modification of the software, component, document etc.
Volume: (Testing) A type of performance testing which increases the volume of users on a system, in each cycle, taking the volume up to a prescribed limit, normally exceeding optimum load.

W……………………………………………………………………………………………………

W3C: World Wide Web Consortium – body creating web standards and guidelines. http://www.w3.org/
WAI: Web Accessibility Initiative. See: http://www.w3.org/WAI/
Waterfall: Project Management Method whereby each element of the software development life-cycle occurs sequentially.
Win Runner: A tool that was historically used for test automation. See Automation Centre.
White Box: Testing normally performed by developers, looking at the code and ensuring that each model of code is performing as expected. See Unit

X……………………………………………………………………………………………………

Y…………………………………………………………………………………………………….
Z…………………………………………………………………………………………………….

Monday, 11 August 2008

How to Annoy a Test Manager

A little light relief from all the serious blogging, but some of these do really get me angry.

The coding has finished and we need to test – should we be talking to you now?

I know you were expecting the code today, but when do you really need it?

Can you please stop raising defects as we don’t have time to fix that many problems?


We have only got half the time we thought we had for testing so how are you going to get all of your work done?

We know the quality is bad, but we are releasing anyway?


UAT has been dropped because the business can’t free any resources.


The fact that this problem was fixed in an earlier release is not indicative of poor configuration management.


Why do we need developers, support and environment resources to work the weekend as well as testers?


The environment is nearly the same as live, we just don’t know how nearly!


Testing is supposed to make the software perfect. Why hasn’t it worked?


We have spent 20% of our budget on analysis, 60% on design and development and 10% on other items. You have 10% left, what can you do for us?


We are running out of money because the test execution is taking too long, so we are going to let the testers go and the developers can finish the job.


Don’t worry about getting testers. We have lots of people in the business that we can get to test at lunchtimes.


The supplier was not asked to perform Unit testing and we can’t afford to have it done now as it was not in the budget.


Testing is a service and as such we will let you know when we need you.


I know you asked for three environments, but we can only get one. Don’t worry. I am sure everyone can get on it at the same time.


The testing is occurring on the development environment. That way the developers can change things whenever they need to.


The problems in live are fixed out of hours so we can’t test them.


If we automate all of the testing how much time will it save us?


Why do we need testers on board before the testing starts?


The user spilt coffee on their system and it crashed. I bet you didn’t test for that did you?


We have too many high severity defects, so we are going to hold a meeting and see how many we can downgrade?


We need to do some performance testing. There are no non-functional requirements, so let’s just assume that everything must happen in under a second.


Testing is easy. Anyone can do it.


It’s not a bug. It’s a design feature.


The requirements were captured at the start of the project. But don’t read that it’s way out of date.

Please feel free to add your own by way of comments.

Saturday, 2 August 2008

Importance of Accurate Test Environments

Look - my new test bed. What a brilliant image! How many of us go here for our next test environment.

Do people realise the importance of the environment to the tester? I don’t think they can. I have spent most of my testing life working with make-do arrangements and being expected to test to high standards. I had a conversation with a fellow tester today, who is currently working as an Environment Manager and he and I were both moaning about the problem.

So what happens? Firstly all of the investment on a project is in the production equipment. As the project is creating application X for the first time, the to-be production environment can be used for testing purposes. It is ideal in this situation because it means that we can test on the most suitable infrastructure possible – what it will run on in live.

The problem comes the next time the application is updated. There was no investment in test infrastructure as part of the original project – they didn’t need it. So now the update project has to justify a massive expenditure in test equipment, which could potentially jeopardise the projects financial benefit. This step is therefore avoided and the hunt begins. We need to find a piece of kit that can be used to test the application. Something which is similar to that in production would do. Alright something which resembles the production kit, if you squint at it whilst wearing dark glasses. The good news comes through. Kit has been found and once the rust is scraped off, it is found to be an earlier version of the kit in production. The RAM is reduced, the processor is 2 years earlier than that which is in production and the operating system has fallen out of support. Never mind, it is all we have. Then the test manager explains that he needs three environments to be able to complete the testing on schedule. Don’t worry we can whack in some more RAM and increase the disk space. It’s still not half as good as production but we can split it into three for you.

This is seen as a pragmatic solution by all involved and the test manager must now do his best. (Agggghhhhh!!!!!!!). Let me explain my frustration. As soon as you compromise the test environment, you compromise the testing. So many times defects are raised which are directly attributable to the environment and if that environment is not the same as production, time is going to be spent resolving defects which will not exist in production and potentially defects which will occur due to the production environment will not be located during testing. Certainly in terms of release testing, the process is likely to be different and effectively the results during testing are false and cannot be relied upon. The lack of adequate test environments becomes a project risk in its’ own right and should be logged in the project risk register accordingly.

It is critical that the testing environment is as close to production as possible and that any deviations are fully understood. Only with the differences between production and testing environments being known and measurable can you rely on the testing results.

Take performance testing. If you are running with less RAM, less disk space, less process power, how will this manifest itself in the results? As for security testing, the operating system version becomes paramount as the level of inherent security is likely to change. Know and document the differences and if this cannot be achieved be careful about signing off the product as fit for release.

As a recommendation to all project managers, ensure that you leave an inheritance of test infrastructure for the following projects. Placing a new piece of equipment live is not sufficient. Consideration must be given to ongoing support, testing, development and training and what environments are going to be used for these.

Grading Exit Criteria

For the sake of this article, let us assume that we have 5 different grades of defect that start with insignificant going on to, minor, significant, major and ending in critical. When we come to exit one phase of a project and enter the next, we need to recognise that criteria will be set by the test manager, which need to be achieved. It is normal that the exit criteria from one phase, becomes the entry criteria for the next phase. For instance, a Test Manager for “Integration in the Large” testing will set his entry criteria, which by default becomes the exit criteria for the phase before. This remains true up to the point of release to live.


What I would like to draw attention to, are two key points. The test manager that says I am not going to have any defects remaining open at the point in time I go live, is living in “cloud cuckoo land”. This is the test manager that wants to be able to test forever and release perfect code. This does not happen. The reality of business is that certain levels of risk become acceptable in order to deliver the project to live and meet the requirements of the business and deliver the business benefits that were used to justify the project in the first instance.


So the next question becomes one of levels of risk and what is likely to be acceptable. This will depend on the nature of the project. One that involves safety critical applications is likely to have a far higher level requirement for quality, than one which is being used by 2 people in a small business. One which is exposed to the public or clients is also going to need to be of a significantly higher level of quality than one which is used internally only. The skill of the test manager is to assess the application, its’ use and define the level of defects that are going to be tolerable. As previously defined in http://tcl-india.blogspot.com/2008/06/entry-and-exit-criteria.html the Project Manager should be bought into these levels in order to ensure support later in the project.


Now we need to look at the defects that are going to be acceptable. A common misconception is to identify that the level of critical defects is 0, be that priority or severity, but that there is no restraint on the level of insignificant defects. This could not be further from the truth. Whilst 1 insignificant defect is not going to stop the release, there comes a volume of insignificant defects that makes the release of the application unacceptable.


I would suggest that we concentrate initially on the severity of defects. We need to understand proportionately that a volume of insignificant is equal to 1 minor, a volume of minor is equal to 1 significant and so on. This will change dependent on the application use, so here are some suggestions for different application types.


Safety Critical
Proportions: 1 Critical = 2 Severe : 1 Severe = 3 Significant : 1 Significant = 5 Minor : 1 Minor = 10 Insignificant
Final Exit Criteria: 0 Critical : 0 Severe : 0 Significant : 5 Minor : 10 Insignificant


Public/Client Facing
Proportions: 1 Critical = 3 Severe : 1 Severe = 5 Significant : 1 Significant = 10 Minor : 1 Minor = 20 Insignificant
Final Exit Criteria: 0 Critical : 0 Severe : 3 Significant : 10 Minor : 20 Insignificant


Internal Consumption (20 + Users)
Proportions: 1 Critical = 4 Severe : 1 Severe = 7 Significant : 1 Significant = 15 Minor : 1 Minor = 50 Insignificant
Final Exit Criteria: 0 Critical : 1 Severe : 5 Significant : 10 Minor : 40 Insignificant


Internal Consumption (0 to 20 Users)
Proportions: 1 Critical = 5 Severe : 1 Severe = 10 Significant : 1 Significant = 20 Minor : 1 Minor = 100 Insignificant
Final Exit Criteria: 0 Critical : 2 Severe : 5 Significant : 10 Minor : 50 Insignificant



Please bear in mind that these are indicative and that the best solution is for the test manager and other members of the project team to determine the levels between them.

Testing in Live – Why you should not!

As a tester I am often asked why we can’t test in live. There are so many positives that can be gained from it that it surely makes sense. After all, the environment is exactly the same as live, the data is real and the volume of users and traffic is real.

Production is designed to serve a business in operation. It is being used in anger every minute of the day. It may be internally used, it may be used by high street shops or it may be open to public use such as the internet.

The first problem is that the code that needs to be tested is not fit for live because its quality is not known. So by placing the code live you are compromising the production platform. You can cause code which is running perfectly in production to fail, as common routines are modified.

Testing is designed to break things. We need to understand the points of vulnerability and testing tries to identify these. This means that the application could be caused to crash, which could result in a domino effect and take out other elements of infrastructure or code.

In testing terms, the point at which resolving a defect is highest, is in production. One of the primary reasons for this is that outages which affect the production platform can be disastrous. Imagine 1000 customer services personnel being unable to work for an hour. A hourly pay rate of £10.00 per hour and the problem has already cost £10,000.00 But what if you have an on-line presence and you lose that for an hour. You have now lost sales revenue for that period of time and this you cannot recover. Perhaps more damaging is that perception of your organisation has taken some public damage. The potential new customer went somewhere else and you have now lost their trade for the foreseeable future. The existing client who was returning has now been forced elsewhere.

Think also of the press that can be received through public outages. Organisations that experience loss of service will often find this being reported in the media and this causes immeasurable brand damage.

Another consideration is that the data which exists on your production system is real. The testing therefore cannot modify, add or delete information without careful consideration of the consequences. Corruption of data exposes an organisation to the data protection act, but worse, may invalidate information which is crucial to your business. What happens if a change of address occurs which is a test – the client is potentially lost along with their business?

A final point is that your system is in all likelihood linked to other organisations. When I first became involved in development, I had a story relayed where a developer had unit tested his code in a live environment. His code was a credit checking piece of software and he used his own details each time he ran the test. As your credit score is negatively impacted each time a check is performed, the developer managed to take his credit rating from positive to negative in a matter of a day. He did not realise he had done this until such time has he tried to make a credit purchase and was refused. Fortunately, after some discussion with the credit reference agency, his rating was restored. But any kind of financial transaction must be performed in a test environment, linking to other test systems. Imagine the damage that re-running a BACS transaction could cause, or payroll being sent out at the wrong time.

Production is very much live. You would not expect a doctor to test a new drug on a human without going through a certain degree of process first. Even then you would move into a clinical trial under strict process.

What about Beta testing I hear you ask. Yes, there are examples when the software is deemed to have no negative impact on production, where sufficient testing has already been performed as to be confident of its capabilities, that the software may be released with a “Health Warning” attached. It may be that a select group of users will be asked to perform a trial. But in these instances, the application will have been put through its’ paces in a test environment.

It is important that users of systems have good experiences. Failure to achieve this results in loss of the users from the system, negative impact to the reputation of the department and individuals making the release, plus the potential to damage the organisation's brand and revenue-earning potential should make this a course of action that is avoided.

Tuesday, 29 July 2008

Reinventing the Testing Wheel (Object Oriented Testing)

I have been thinking about this one for some time and wondered what other views existed. For some time developers have taken a more modular approach to programming, applying techniques such as Object Oriented Design, in order to improve efficiency. Why re-invent the wheel each time a certain piece of code is required? Take something like a calculation of VAT. Once this has been written the first time, that should be enough and if stored and indexed correctly, each time someone else needs a VAT calculation they call a pre-written routine from a library. Not only does this mean that the developer does not spend valuable time writing the same code again, but also that the module should already have been tested and therefore be reliable, reducing the likelihood of errors.

This was seen as a major break through in the development world, but one which has not been replicated to my knowledge in the testing arena. When we write a manual test script, we write it in a manner which is long hand. So how many times have we written scripts to test VAT calculations? Why are we not creating a library of scripts that are re-usable by all testers? Why do we have to sit and think each time that we test a field: to understand what all the permutations are that we need to deal with, how to test it positively and negatively? There are hundreds of thousands of testers all over the world that are repeating the same thought processes, writing the same scripts, duplicating their efforts.

How many times has an input of a person's age been tested? What are all of the parameters? How old before they are at school, how old before they can hold a credit card, bank account, retire? All of these questions have been thought about so often, but we still religiously recreate them each time. So testers are accused of being too slow or not moving with the times, being overly expensive. Well I suppose when you look at something like this, the answer has to be, "Yes".

So when we are asked what the future may hold for testers, I put on my rose-tinted spectacles and imagine…..

I imagine a world where we are sharing our knowledge and expertise, generating a global testing community and capability. One where we are seen as slick operators, contributing massively to technology programmes the world over, with the minimum of input for the maximum return.

How does this happen? If there were a central repository for scripts to which every tester contributed, where we went as a first port of call to locate our script components, or store those components we have to create, we would quickly generate a wealth of stored expertise. A Wikipedia of test scripts – wow! We would need to be able to locate scripts in a fast and efficient manner and the database used to store the script components or objects would need to be referenced in a multitude of ways. But this is not new technology. Developers have been doing a lot of this for years and we can no doubt learn from the mistakes that they made along the way.

I would welcome comment on this. Is it feasible? How could it work? Am I barking mad? If you are a developer and have a story about OOD then share it and let us know if you think this is feasible. Drop me a line and let me know.

Saturday, 19 July 2008

Site Under Construction!

In the current climate of the credit crunch and with so much positive press around the buoyancy of the internet, more organizations are looking to the World Wide Web to maintain or increase sales. What many are doing is realizing that their sites are perhaps not as good as they could be and are investing in updating or de-developing them. For others, the process of site maintenance is an ongoing activity with a dedicated team.

So with all of this development going on, it would be fair to assume that there must be a lot of testing as well? I would suggest that the answer is no. For some reason, when people are requesting development of web sites, it is believed that they are best placed to ensure that it is fit for purpose.

This is a bad assumption for several reasons:
1. Finding the time to thoroughly test the website is difficult to achieve. The people responsible for the new website are normally being asked to do this as one of many tasks.
2. The attention to detail required to check the entire site, is high and demands a certain type of individual. The tester has this mindset and is used to applying methodical and meticulous tests, whereas the business person may not be.
3. This may be the first time that the business person has been asked to test anything. Testers are used to testing websites, this is something that they do on a regular basis and this enables them to make better use of their time, homing in on problem areas.
4. Business resources normally check things positively, making sure that situations that are expected are dealt with. The tester introduces negative testing. Checking to understand that the site can handle abnormal activity, that which deviates from the norm.

So what is happening? Companies are employing development agencies and placing themselves in their care. They are relying on the development agency to ensure the quality of the site. The business are doing their best to make sure that the site is okay and are paying for development when they think it is finished.

In a normal IT project, the business relies on the testers to ensure that the application is to a certain standard before it comes anywhere near to them and this step is not being performed. Three problems result from a lack of in-built quality: The first is that the development agency is paid for the delivery, even though problems may not manifest until later. The second is that the development agency is held in low esteem once they have been found to have under-delivered. The third is that the organization requesting the website, find that they have a tool which does not meet their needs and therefore requires further investment to put the problems right.

The involvement of testing as part of the process ensures that the site is performing as was requested. It can be used as a means of safeguarding the payment, ensuring that the development agency have fully delivered prior to releasing funds. It also protects the development agency from losing their customer due to poor satisfaction.

The design is truly the prerogative of the business and only they can say if the look of the site is what they wanted to achieve. Other than this it should be placed in the hands of the experts. Remember that better quality, means customers are happier to use the site, more likely to find what you have to offer and therefore an increase in sales should result. I have said in many places that a poor web experience results in lost sales and that users are highly likely to leave your site for one offering a better experience or easier to find items.

Friday, 4 July 2008

Reasons for Offshore Failure

It is often the case that Indian resources are accused of failing to deliver what was requested. In my experience, whilst they are not faultless, more often than not the root cause of the problem is that what is required has been poorly specified. In all walks of life, when purchasing we expect the contents of the tin to be that which is described on the label. Why should testing be any different?

The reality is that people have been greedy for the savings that can be achieved from global economies. Regardless of a project’s suitability for offshore work, the project is forced down this path and may fail. The resources employed do their level best to deliver, but the reality is that with poor specifications and requirements, the chance of delivering to a high standard is significantly lowered.

Another area, in which mistakes are made, is the desire of the client to specify how the offshore operation will work. This may be flying in the face of years of experience, but the desire to control and make sure it works is so high that these factors are ignored, having the opposite effect. The offshore capabilities may also be culpable for not being stronger or refusing to engage in certain situations, but someone once said “the customer is always right”.

Whatever the culture that you are dealing with, be respectful of it. Accept it for it’s strengths and weaknesses and learn how to work with, through or around them. Recognize that as a nation you are likely to have your own idiosyncrasies and that these will be magnified to other nationalities.

The English reserve, the stiff upper lip, the desire to queue, being over polite, being rude, thugs, hooligans, the english have been accused of them all and no doubt there are those amongst us to whom elements remain true in part or whole. We expect others to deal with our traits, so why should we not be able to deal with others?

Beware of getting what you ask for. If you ask someone to take the shortest route to the other side of the mountain, it is technically accurate that this will involve tunnelling through the middle. This will take infinitely longer but is what was ordered. The expectation may have been that someone would either go around or over the top, but that was not what was requested. If your instructions to an offshore capability are specified precisely, the likelihood is that these instructions will be followed. Making sure that they are what you want takes some self-questioning before commencing.

Thursday, 26 June 2008

Test Script Storage

Storage of anything should be in a manner whereby retrieval of the item is easy. If we look at a library, everyone is familiar with the process. Find the section dealing with your subject matter and then search for the book by author. It has a proven track record and we are all able to go into a library and find what we are looking for (as long as it is there).

Test scripts are no different. As testers we generate vast volumes of scripts and need to be able to re-use them. It strikes me as odd therefore, that scripts are so often stored against a project. There may be subdivisions within the project structure for each of the applications being tested, perhaps even a definition of which version the scripts have been written against. Indeed If the testers are a constant from one phase of the project to the next, the scripts are likely to be re-used.

But for each project there is normally a primary application that is being tested and the others are interfacing systems. The scripts that are generated dealing with the interface do not necessarily cover the entire application. The first problem occurs when someone outside of the project needs to test the primary application. If they are unaware of the project name, the chances are that they will produce their own set of scripts. We now have a duplication of effort occurring. Each new script that is written is potentially wasting effort.

The second problem is that the scripts that were written to test a change to an interfacing system, will not be stored in a way that is usable or locatable by those testing it as a primary application. This generates two problems, the first being that the test suite for the interfacing system is now out of date. The second problem is that the regression pack has not been updated to reflect the changes and therefore future changes may introduce problems into the new code which will not be identified. At best the difference in version may alert the testers to the fact that a change has occurred and time will be spent trying to re-locate the scripts, or more likely, they will find out what the change was and generate their own scripts.

I believe the way to avoid this is to ensure that scripts are not stored by project, but always by application. The application should then be divided into a series of suites, one for each version. Lastly a regression pack should exist as a permanent fixture. This allows the storage of scripts as deltas to the original suite and then as each new version of the application is developed, the scripts can be reviewed for those which would best augment the regression pack. It may be prudent to have each version contain all scripts, as some will have been modified or removed from the test suite.

This means that any one on any project, can look at the applications they are working with and know without doubt, where to look for the scripts. I can only see one argument against this, which is around end-to-end tests and UAT, where the focus on the application is not present and the focus is more around the business process. In such instances these scripts may need to be stored against the project.

To my way of thinking, this is symptomatic of testing being seen as a service to a project. Therefore the need is to satisfy the project’s needs by storing everything in a very project-centric manner. The reality is that this is costing organisations a vast amount of time and money as scripts are permanently re-generated in order to meet the current requirement.
The situation becomes worse where large volumes of external resources are involved. A lack of consistency and knowledge leaving the client organisation becomes an issue and the likelihood of finding a previously written set of scripts lowers dramatically.

Lastly, the regression pack is key to ensure the stability of the production platform and anything which compromises the regression pack undermines the efficiency of the business.

So – to summarise, ensure that test scripts are written and stored by application wherever possible. Breakdown the scripts under the application folder by version and have a generic regression pack sub-folder either at application level or version level.

W3C 29 out of 30 Sites Fail

W3C makes the following statement:

“W3C primarily pursues its mission through the creation of Web standards and guidelines. Since 1994, W3C has published more than 110 such standards, called W3C Recommendations. W3C also engages in education and outreach, develops software, and serves as an open forum for discussion about the Web. In order for the Web to reach its full potential, the most fundamental Web technologies must be compatible with one another and allow any hardware and software used to access the Web to work together. W3C refers to this goal as “Web interoperability.” By publishing open (non-proprietary) standards for Web languages and protocols, W3C seeks to avoid market fragmentation and thus Web fragmentation.”


So how come so many sites are not following these standards. As a piece of work recently, we looked at 30 random web sites and checked them for W3C compliance. We found that only 1 of the 30 passed the check.

What was perhaps more surprising, was that around one third of the sites that were reviewed, had an error count of less than 30. Would it not be reasonable to suspect that an organisation which is so close to compliance to the foremost standards on the web, would go the extra mile and achieve compliance? I must therefore assume that these organisations are unaware of the fact that they are nearly W3C compliant and are developing their websites in ignorance, relying solely upon the development agencies to abide by their own standards, some of which may happen to coincide with W3C.

So what are the problems that organisations that are not W3C compliant going to face? Foremost, the transfer of the development from one agency to another is going to become more complex. Rather than being able to transfer code that is well written and understood by many, the site owner may become tied to a certain development agency, as they are the only ones that understand the code. The cost of changing a website completely is often far too expensive to consider, resulting in a reliance on one particular supplier.

Secondly, these standards once employed facilitate more effective and efficient crawling by web robots, who gather the information that search engines use. This means that poorly written code, translates to hard work for robots, poor understanding by search engines, lowering chances of the site being identified and reducing traffic to the site. Reduced traffic means reduced sales.

Thirdly, for those that are using the site from a disabled perspective, the tools that they use to try and surf the web, are hindered by poor code, making it more difficult to look at the site. We have already discussed elsewhere in the blog the importance of making web usage easy, yet here we find another example of poor user experience. Some organisations have even had lawsuits filed due to them failing to meet their obligations to disabled users.

Lastly, the site is less likely to transfer to other platforms used to surf the web, such as mobile phones and handheld devices. This is again restricting the use of the site, barring individuals that do not come on line using the mainly prescribed mechanisms.

My last point on W3C for the moment, so as not to be taken as a complete hypocrite, is that when I checked a couple of blogs, including my own, the volume of errors was in the hundreds. I am not yet certain whether this is something that can be remedied, but I can assure you that we will be looking at it and will let you know the results.

In summary, get your site W3C checked. Know that you are giving all users the best possible chance to use your site, have a good experience and possibly even generate a sale or two.

Thursday, 19 June 2008

Middleware Regression Testing

I have been working for a client on an interesting problem recently, which I thought I would share on the blog. The problem has been around the regression testing of an item which is intrinsic by nature, to many other projects. The item is classed as middleware, which provides a translation between two different systems, but is being relied upon increasingly, with in excess of 50 systems now interfacing. Most projects now require the middleware to be updated and the volume of change is placing the regression testing under increasing pressure as more releases occur.

The problem is amplified as the projects are working individually and the middleware changes are independent as a result. A group of projects are collated to form a release and once normal testing is completed the middleware changes are converged to form a single drop of code, which is then passed into the regression testing phase.

The first mistake has been made. The projects are not taking accountability for testing the converged code and in some instances have even been disbanded prior to this testing occurring. At this point the release has lost the testers with the understanding of the end to end function and more pressure is applied to the regression test team, to trace the scripts from the project, interpret them and generate new scripts. It is important that The testing of the converged code is now taking up large amounts of the already pressured regression testing window. This needs to be pushed back to the projects and the convergence owned by them.

By removing the testing of the converged code from the regression process, more time is now allowed and full regression can be performed, but this does not provide a future proof solution. The same window is now being fully utilised and as the volume of utilisation increases over time, the regression pack will increase and the window will become too small again.

This is an ideal opportunity to make the most of an automated solution. If we look to industry standards, automation makes a test 7 times faster to execute but 7 times longer to write. This means that the testing duration, once automated can be reduced to 1.5 days. Now we have a regression test that is only performing regression; that can be executed swiftly and provides scope for future growth.

The testing environments were another level of complexity. Whilst the project completed it’s testing with all the required components/systems/applications, the regression team, within their two week window had to acquire their own equivalent. Again this was another drag on time, but more importantly the regression was sometimes being performed on an environment that was incomplete. The result has been to make the regression middleware environment available to the projects for the convergence testing, but to utilise the projects interfacing systems. In order to future proof, the regression testing will be moved onto a pre-production environment.

There were other aspects to this problem, but those listed were particularly pertinent. The following feedback was received from two sources as a result of the work and presentation of the findings:

“I was delighted that your slides prompted so much discussion, even if it made your presentation difficult, and that by all accounts we have got the main individuals on board.”

“I was very appreciative of the clear way you presented where we are and your proposals for going forward, together with a clear capture of issues that are spoken about in lots of quarters but never pulled together into a single picture. Great.”

In summary – regression testing should encompass the entire system.
Projects should retain responsibility past the point of release to production.
Automation is ideally suited to regression testing.
Testing should always occur on as complete an environment as possible.

Monday, 16 June 2008

Dealing with Delays Impacting Software Testing

We have all been there, on a project where the inevitable has happened. You guessed it, the code is late into testing, delivered at the 11th hour. Entry criteria has come under threat and possibly been ignored completely. Your test environment has been delivered but remains unproven as the code has not been available. The Project Manager has been harassed by the business stakeholders for the development delay and is not interested in your problems. IT Management are pressing to see the project delivered on time and to top it all, Marketing have arranged for a campaign launch to occur on the prescribed delivery date. As the Test Manager, you are now the primary obstacle to go live; the success of the project is resting on your shoulders. Oh yes, and your six week testing window has been reduced to four.

This is the stress (no pun intended), of the test execution phase. Not only are you now required to think out of the box in order to complete the testing, but you must also be thinking at a far wider level than just testing. There are actions that can be taken at a project level which can make a massive difference to the work of the testers.

Let’s start by looking at this from the wider perspective. I remember a situation on a very early project I was managing. Sat in a project progress meeting and being asked how we could test with an execution window reduced from four weeks to two. I dug my heels in and refused to budge, resulting in a separate meeting immediately afterwards with the PM, being instructed that this was not the right course of action and getting some early tuition in the art of testing.

Back to our problem, there are several actions that can be taken at project level to help with the situation and it may be possible to assist the PM by making some recommendations. (1) Does the application all need to be placed live? Are there any aspects of the application that could be put live as part of a second release, reducing the scope of the testing required? (2) Can the release occur to internal users only? This minimises the risk of damage in the event of production defects, meaning that exit criteria may be reviewed. (3) Can additional development effort be applied to recover whilst in development?

Regardless of the answers at a project level, the following can be applied by the Test Manager to handle the situation from within testing:

(1) Insert the testers into the development team and increase the unit and integration in the small testing. Improve the quality before it hits testing, reducing the volume of defects found and therefore the duration.
(2) Consider taking components of the application that are finished, prior to the arranged delivery date. It is likely that there are only certain parts of the application that are causing the delay and not the entirety of the application. Bringing in some parts early, increases the testing window and enables recovery of some of the lost time.
(3) Apply a risk based testing technique. Test the high risk elements of the application first and work through the testing in order of risk. When time runs out, this should mean that the only the items of lower risk have been omitted.
(4) Increase the hours being worked by the team. Look at options around overtime and weekend working. If using offshore capabilities then look at working two days in one. (A word of warning at this point, if the testers are working, they need to be supported by the environment support staff and the developers. Testing alone will only increase the flow of defects making it harder for development to keep up and an environment issue could stop all out of hours work.)
(5) Consider overlapping some of the testing phases. E.g. If UAT is being run as a separate phase, after functional testing, look at overlapping some of the UAT with the functional testing that is occurring.
(6) Ensure that there is a high focus on defect prioritisation by the business. Make sure the developers are fixing what needs to be fixed first. (Don’t ignore severity at this point.)
(7) Monitor defect turnaround. If the development has arrived late it is indicative of problems and a slow defect turnaround will cripple the project and whilst testing may complete, whilst the exit criteria will have been corrupted.
(8) Can more environments be made available? There is likely to already be a requirement for multiple environments, but if you begin overlapping test phases, functional with non-functional, with UAT, then the volume of environments needed may increase.
(9) Carry out a review of the exit criteria for the project. Bear in mind that this was set prior to the problems occurring and although they are the desired outcome, some compromise may need to be reached. Work out what is acceptable and don’t forget that if coverage is reduced, the numbers of defects are indicative of only a percentage of the testing. i.e. 80% coverage, means that you have possibly only have discovered 80% of the defects and it is good to assume that 20% remain unfound.

Actions (2), (3) and (5) above, all increase risk in some manner. Ensure that the project and stakeholders have agreed to these risks and that where possible mitigating actions are in place.

To summarise, there are many actions that can be taken within testing to deal with a slippage, whilst maintaining the original delivery date. Don't forget the project elements that can make a difference. I am sure there are more but do ensure that all aspects are being looked at and only then start to compromise on the testing.

Thursday, 12 June 2008

Static Testing - Do you have a requirement?

Static Testing is the first form of testing that can be applied during the software development life-cycle. Once the requirement document has been produced it should be checked against the 8 points identified below. This will ensure the removal of defects prior to other departments or resources becoming involved and therefore minimise costs.

60% of all defects are attributable to the requirement specification.





The 8 point check applied in order to perform static testing against a requirement document is as follows:
-Singular: One requirement that does not refer to others or use words like "and".
-Unambiguous: Not open to more than one interpretation. Clear and easy to understand.
-Measurable: Avoids use of words like instant, approximately. Specifies given units, such as hours minutes and seconds.
-Complete: The requirement is not lacking information or supporting data.
-Developable: The developers will be able to implement the requirement.
-Testable: The testers will be able to test the requirement.
-Achievement Driven: A benefit is associated, which is tangible.
-Business Owned: A member of the business owns each requirement, providing a point of reference and approval.

Within the testing discipline, 60% of defects are believed to be attributable to the requirement specification. This means that one of the largest contributors to poor software quality can be remedied at project initiation. It is also widely accepted that each phase later in the software development life-cycle that a defect is found, it costs 10 times more to resolve. In the simplest form, this means that for every £1 it costs to resolve a defect at the point of the requirement being defined, if missed until the resulting application is live, will cost 10,000 time more. This is due to the effort that will have been spent designing, developing and testing something which was wrong, but the real cost comes when a problem in live causes an outage affecting large volumes of users and perhaps even stopping them working. Not only does this impact the individual, but dependent on what they are doing, could stop income to an organisation's other departments: Sales, Billing, Payroll. All of these become disasters and if in the public eye can lead to bad press for the organisation.

It is 10,000 times cheaper to fix a defect in the requirement compared to live!

We are trying to make static testing for organisations as easy and affordable to achieve as possible to achieve for organisations. Without complexities of billing and non-disclosure, the document can be e-mailed to either of the contacts detailed below. Our pricing is fixed so there are no surprises along the way.

Grant.Obermaier@TransitionConsulting.in or Mick.Morey@TransitionConsulting.in


Testing will be scheduled and will take between 5 and 30 working days. If a faster turn around is required please specify any deadlines and we will advise on achievability.

Early Defect Detection

They say that it is the early bird that catches the worm. The same is true in software testing.

The process starts with a requirement and from this point onwards, there is gradually more and more effort being applied to the creation or modification of an application. More people become involved and the cost of the solution increases. This is the natural course of events. It is therefore a natural conclusion, that if a mistake is made in the requirement, the cheapest time to fix the problem, is as the requirement is being defined, or immediately afterwards. This keeps the cost to a minimum. The same logic applies to design, development and test. Yes, even testing has the ability to insert defects, with badly written scenarios, scripts or reporting defects that are not real.

Defects are introduced throughout the software development lifecycle and the art of testing is to find as many of them as possible when they are inserted. It is widely recognised that there is a parabolic curve of defect insertion. The starting point is the requirement specification which begins by inserting 60% of the defects. The curve terminates with live or production, where the intended result is to find 0 defects. The tester should report on completion of the project, the defect detection efficiency. This looks at understanding for each defect, where it was inserted and where it was detected. A perfect test process would look to identify each defect as it is inserted. This is highly unlikely and the reality is that some defects will be found in later phases of testing, or indeed in live.

It is important to understand that projects testing budgets can double when critical steps such as static testing are not performed. This forces 60% of the defects into later phases, incurring as a minimum the cost of the design. Projects also often suffer from slippages and with test execution occurring at the end of the process, is often squeezed or compromised. The project must also realise that reducing the testing duration or coverage, is likely to increase the risk of a defect being found in live, where in comparison to it being found and removed in the requirements phase, will cost 10,000 times more to resolve, at best 10 times more. The reality here is that a defect undetected until live, can be business impacting, brand damaging and could cause a business to fail.

It is therefore important that testing is involved in the project from the outset, not as something that is included if there is the time, the budget and the inclination. Only by the application of systematic testing throughout the project is the quality level going to be understood and the opportunity to remedy problems in a timely manner presented.

Monday, 9 June 2008

Entry and Exit Criteria

As you pass from one phase of testing into the next, there is a need for control. For the purpose of this post, we will refer to the prior phase as the supplier and the current phase as the recipient. The supplier needs to retain control of their testing phase, until such time as it is deemed ready for release. The recipient needs to ensure that the testing performed by the supplier has achieved a sufficiently high standard as to be acceptable.

The means of achieving this is referred to as Exit Criteria for the supplier and Entry Criteria for the recipient. These criteria are documented in the test plan and define the standards that should be achieved entering and exiting, the test phase described by the document.

The criteria are set by the Test Manager or nominated delegate. They may take any form that the test manager deems necessary, although are more frequently based on defect volumes of certain severity and priority, along with test assets from the supplier.

Consideration should be given to the use of other information, drawing on experiences of dealing with particular project teams, development agencies etc. This requires the Test Manager to be able to think outside of the pure testing aspects of the project, to look and see what else may impact them. Closer to the heart of the Test Manager are subjects like the Test Environment/s and Configuration Management. The environment is one of the main enablers to testing and should be made available two weeks prior to test execution commencing. Without comprehensive Configuration Management the likelihood of controlled deliveries from development into testing is severely reduced. Such events and dependencies make excellent criteria and are sound reasons for not entering into a subsequent phase of testing.

Looking at the testing components only, Test Managers should ensure that the supplier of each testing phase is held accountable for the production of the associated test assets. The volume of defects is often seen as a point of contention. Test Managers should avoid making statements such as zero defects allowed, or setting the bar so high that entry or exit becomes impossible to achieve. Having to relax these criteria because they are impractical corrupts the integrity of the testing function and undermines the credibility of the Test Manager. Work with the Project Manager when setting these criteria, ensuring that they are bought into them and don’t rely on just a signature on a document. This gives a higher level of buy in and ensures that any future change to the criteria is going to be resisted by both the Test Manager and the Project Manager. Always ensure that such changes are formally change controlled.

It is recommended that on entry into Integration in the Large, there should be no top priority or top severity defects outstanding. This is not to say that there can be no defects, only that items which are so important to the business as to warrant a top priority, should be resolved as a priority. Defects of the highest severity are perhaps more debatable, but delivering an item with high severity defects indicates that elements of the testing cannot be completed and the deliverable is therefore significantly below the level of functionality that has been specified and is expected.

If circumstances dictate that entry or exit criteria are going to be overruled, as a minimum the risk register needs to be updated to reflect that this has occurred, detailing the impact and mitigating actions. It is worth noting that this is normally indicative of a project in trouble and that timescales are now seriously at risk.

Saturday, 7 June 2008

SOFTWARE TESTING GLOSSARY

This glossary is a living post – so will be edited as we come across terminology that is not included. If you have any suggestions or disagree with an explanation, drop us an e-mail and let us know. TCL India offer this as a means of establishing glossaries of your own or as a point of reference.



A………………………………………………………………………………………………………………………………………………………………
Accessibility: (Testing)Looks at an application to ensure that those with disabilities will be able to use the application as an able individual.
Agile: A development method, involving the creation of software, with the contributing parties, including testing, all working on the same item at the same time.
Alpha: (Testing)Testing of an application which is in production, but not available for general use. This is normally performed by users internal to the business.
Analyst: Person who interacts with the business in order to understand and document their requirements for an application or change to an existing one.
Analyst (Test): Person responsible for the preparation and execution of test scripts, recording and progressing of defects, reporting into the Test Team Leader or Test Manager.
Automation: The process of developing a script or program which can be run by software rather than a Test Engineer, to test an aspect of an application. Automation is used to increase the speed of test execution.
Automation Centre: A tool used in the automation of software testing. See
https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-127-24%5E1074_4000_100__&jumpid=reg_R1002_USEN
B………………………………………………………………………………………………………………………………………………………………
Beta: (Testing)Testing of an application which is in production, but not available for general use. This is normally performed by a select group of friendly external testers.
Black Box: The process of testing without understanding the internal workings of an application, relying on inputs and outputs only.
Bug: See Defect
Business Requirement Specification: See Requirement Specification
C………………………………………………………………………………………………………………………………………………………………
Case: See Scenario
Code: The software that has been produced by development and is being subjected to testing.
Completion Report: A document produced during the testing and presented to the project manager on completion of testing activity. The document should detail the tests that have been performed along with the associated results and defects. Some reports may include a recommendation for the applications suitability for release to production.
Configuration Management: The means of managing the components required to make a larger item. Applicable to files, documents, data, hardware, software, tools. Understanding of the versions of each component required in order to be able to re-build the larger item.
Criteria: See Entry Criteria and Exit Criteria
D………………………………………………………………………………………………………………………………………………………………
Data: Information pertaining to the use of a system or recorded through the use of a system. Data is used in order to test a system, potentially after data cleansing if personal information is involved.
Data Generator: A tool used to generate high volumes of data in order to be able to test many permutations, or to load test an item.
Data Scrambling: The process of altering personal information from data to be used for testing purposes.
Defect: Where the item under test has been found to inaccurate, resulting from testing. Primarily used in associated with software, but equally valid for static testing of documentation.
Defect Detection: The means of identifying a defect. Can be a metric used to predict the volume of defects expected during the course of a project, or as a means of looking back at a project to understand where testing needs to be concentrated in future projects of a similar nature.
Defect Removal Efficiency: A metric used to assess the ability of testing to remove defects as they are introduced, during the software development life-cycle, keeping the cost of testing later phases to a minimum.
Defect Turnaround: The time taken from the identification of a defect, through to the point of resolution. Different levels of granularity may be used. e.g. A focus on the time taken by development.
Developer: A person responsible for the development of an application.
Development: A process of producing an application by production of low level design, code, unit testing and integration in the small testing.
Dynamic: Testing which occurs on the right hand side of the V-model, with the application present.
E………………………………………………………………………………………………………………………………………………………………
Environment: The combination of hardware, software and data as used in development, testing and production. The platform/s upon which the testing occurs.
Entry Criteria: The criteria that must be met prior to a deliverable entering the next phase of testing to another. This is normally associated with documented test assets and pre-agreed volumes of defects.
Error: See Defect
Exit Criteria: The criteria that must be met prior to a deliverable leaving the current phase of testing. This is normally associated with documented test assets and pre-agreed volumes of defects.
Execution: The process of working through a script on the application under test, in the testing environment.
F………………………………………………………………………………………………………………………………………………………………
Functional: (Testing) The testing of a products function, against requirements and design.
Functional Specification: A document which extracts all of the functional requirements from the requirement specification.
G………………………………………………………………………………………………………………………………………………………………
Glass Box: See White Box
Grey Box: Testing performed by testers with some knowledge of the internal workings of an application. See also Black Box and White Box testing.
H………………………………………………………………………………………………………………………………………………………………
High Level Design: A design showing the major components and how these will interface to each other, defining the hardware to be used and the software that will be impacted.
I………………………………………………………………………………………………………………………………………………………………
Integration in the Large: Where the application or applications that have been developed are brought together along with those which have remained unchanged, building a production like system around the application/s. Testing is then applied looking at the communication between the different applications.
Integration in the Small: Where the components of the application that have been developed are brought together along with those which have remained unchanged, building the application or major component of a single application. Testing is then applied looking at the communication between the different components.
Integration: The act of bringing many parts together to form a whole.
ISEB: Information Systems Examination Board. This was historically the board that was used to certify test professionals at either Foundation (Entry Level) or Practitioner Level (Advanced). See:
http://www.bcs.org/server.php?show=nav.5732
ISTQB: International Software Testing Qualifications Board. See:
http://www.istqb.org/
J………………………………………………………………………………………………………………………………………………………………
K………………………………………………………………………………………………………………………………………………………………
Key Performance Indicator: A mechanism built on one or metrics, which determines a band of acceptable performance, which over time is often targeted towards improvement.
L………………………………………………………………………………………………………………………………………………………………
Load: One of the types of performance testing, this looks at testing for the maximum load on the system.
Load Runner: Tool used to performance test one or many applications, to understand how it handles increases in load. See:
https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-15-17%5e8_4000_100__
Low Level Design: Definition of exactly how the application/s will be modified or produced in order to meet the requirements and the high level design. This can extend in some examples to elements of pseudo code being defined.
M………………………………………………………………………………………………………………………………………………………………
Metric: A measure of an attribute or occurrence in connection with an organisation, department or functions performance.
N………………………………………………………………………………………………………………………………………………………………
Non-functional: How an application performs, rather than how it does it.
Non-functional Specification: A document which details the non-functional requirements such as performance, security, operational elements.
O………………………………………………………………………………………………………………………………………………………………
P………………………………………………………………………………………………………………………………………………………………
Performance Centre: A tool used for measuring the performance of an application or series of applications. See:
https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-126-17_4000_100__
Performance: Used to describe many types of testing relating to the speed of an application. See Volume, Load and Stress.
Plan: A document produced for a type of testing defining how the testing will be performed, when the testing will be performed and who will be performing it. The test plan lists the test scenarios that will be scripted.
Preparation: The process of generating the test scripts.
Priority: The importance of fixing a defect from a business perspective. Defined by business representatives.
Q………………………………………………………………………………………………………………………………………………………………
Quality: The suitability of an item for its intended purpose and how well it achieves this.
Quality Centre: Tool used to assist with the management of testing, recording and tracking scripts, logging and tracking defects and more. See:
https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-127-24_4000_100__
R………………………………………………………………………………………………………………………………………………………………
Regression: Retesting of a previously tested program following modification to ensure that faults have not been introduced or uncovered as a result of the changes made
Requirement Specification: A document normally produced by a business analyst, capturing the needs of the individual in a manner which means that they can be translated into a software solution.
Re-Test: Taking a defect which has failed and executing the associated test script again.
S………………………………………………………………………………………………………………………………………………………………
Scenario: A high level description of how a requirement is going to be tested.
Script: Referable back to the scenario, the script defines each step that must be passed through in order to perform a test, along with the expected results. As the script is executed, results are recorded and if they match the expected result are marked as passed, otherwise as failed. A script containing a failure should have a resultant defect raised.
Schedule: A document, similar to a project plan, but detailing the activities associated with testing, when they are due to occur and who will be performing them.
Severity: The importance of a defect to testing and the application. Defined by Testers
Smoke: A process of proving an application or environment is ready to commence full testing, by running a sample set of scripts testing the primary functionality and/or connectivity.
Static: The process of testing without the presence of software. Normally refers to the testing of documentation.
Strategy: A document produced at project or programme level, defining what testing is to be performed.
Stress: A form of performance testing, whereby the volume of testing is increased to a point at which the application is deemed to be failing to perform, either due to failure to meet performance criteria or system breakdown.
T………………………………………………………………………………………………………………………………………………………………
Technical Architecture Document: Definition of how the business requirements should be translated into a technical solution at the highest level.
Test Director: A tool used for test management, capture of requirements, scripts and defects, with the ability to manage defects through to resolution. Now replaced by Quality Centre.
Testing: The process of reviewing an item for accuracy and its ability to complete the desired objective.
U………………………………………………………………………………………………………………………………………………………………
Unit: The testing of the application by the developers at a component or modular level, looking at whether the code is performing as expected.
User Acceptance: The means of testing applied, normally by members of the business or recipients of the system, whilst still in the test environment. This looks to ensure that business requirements have been understood by all involved in the application production as well as providing an opportunity to check the business processes that the application will be used in conjunction with.
V………………………………………………………………………………………………………………………………………………………………
V-Model: A testing focussed software development life-cycle where the process of creativity occurs down the left side of the V and the process of testing up the right side of the V, where each step down the V has a corresponding point of testing up the right of the V. Begins with a requirement and terminates with User Acceptance Testing.
Version: An alpha numeric means of identifying a particular build of software, or a component thereof. The version changes incrementally to reflect each modification of the software, component, document etc.
Volume: (Testing) A type of performance testing which increases the volume of users on a system, in each cycle, taking the volume up to a prescribed limit, normally exceeding optimum load.
W………………………………………………………………………………………………………………………………………………………………
W3C: World Wide Web Consortium – body creating web standards and guidelines.
http://www.w3.org/
WAI: Web Accessibility Initiative. See:
http://www.w3.org/WAI/
Waterfall: Project Management Method whereby each element of the software development life-cycle occurs sequentially.
Win Runner: A tool that was historically used for test automation. See Automation Centre.
White Box: Testing normally performed by developers, looking at the code and ensuring that each model of code is performing as expected. See Unit
X………………………………………………………………………………………………………………………………………………………………
Y………………………………………………………………………………………………………………………………………………………………
Z………………………………………………………………………………………………………………………………………………………………