Saturday, 2 August 2008

Grading Exit Criteria

For the sake of this article, let us assume that we have 5 different grades of defect that start with insignificant going on to, minor, significant, major and ending in critical. When we come to exit one phase of a project and enter the next, we need to recognise that criteria will be set by the test manager, which need to be achieved. It is normal that the exit criteria from one phase, becomes the entry criteria for the next phase. For instance, a Test Manager for “Integration in the Large” testing will set his entry criteria, which by default becomes the exit criteria for the phase before. This remains true up to the point of release to live.


What I would like to draw attention to, are two key points. The test manager that says I am not going to have any defects remaining open at the point in time I go live, is living in “cloud cuckoo land”. This is the test manager that wants to be able to test forever and release perfect code. This does not happen. The reality of business is that certain levels of risk become acceptable in order to deliver the project to live and meet the requirements of the business and deliver the business benefits that were used to justify the project in the first instance.


So the next question becomes one of levels of risk and what is likely to be acceptable. This will depend on the nature of the project. One that involves safety critical applications is likely to have a far higher level requirement for quality, than one which is being used by 2 people in a small business. One which is exposed to the public or clients is also going to need to be of a significantly higher level of quality than one which is used internally only. The skill of the test manager is to assess the application, its’ use and define the level of defects that are going to be tolerable. As previously defined in http://tcl-india.blogspot.com/2008/06/entry-and-exit-criteria.html the Project Manager should be bought into these levels in order to ensure support later in the project.


Now we need to look at the defects that are going to be acceptable. A common misconception is to identify that the level of critical defects is 0, be that priority or severity, but that there is no restraint on the level of insignificant defects. This could not be further from the truth. Whilst 1 insignificant defect is not going to stop the release, there comes a volume of insignificant defects that makes the release of the application unacceptable.


I would suggest that we concentrate initially on the severity of defects. We need to understand proportionately that a volume of insignificant is equal to 1 minor, a volume of minor is equal to 1 significant and so on. This will change dependent on the application use, so here are some suggestions for different application types.


Safety Critical
Proportions: 1 Critical = 2 Severe : 1 Severe = 3 Significant : 1 Significant = 5 Minor : 1 Minor = 10 Insignificant
Final Exit Criteria: 0 Critical : 0 Severe : 0 Significant : 5 Minor : 10 Insignificant


Public/Client Facing
Proportions: 1 Critical = 3 Severe : 1 Severe = 5 Significant : 1 Significant = 10 Minor : 1 Minor = 20 Insignificant
Final Exit Criteria: 0 Critical : 0 Severe : 3 Significant : 10 Minor : 20 Insignificant


Internal Consumption (20 + Users)
Proportions: 1 Critical = 4 Severe : 1 Severe = 7 Significant : 1 Significant = 15 Minor : 1 Minor = 50 Insignificant
Final Exit Criteria: 0 Critical : 1 Severe : 5 Significant : 10 Minor : 40 Insignificant


Internal Consumption (0 to 20 Users)
Proportions: 1 Critical = 5 Severe : 1 Severe = 10 Significant : 1 Significant = 20 Minor : 1 Minor = 100 Insignificant
Final Exit Criteria: 0 Critical : 2 Severe : 5 Significant : 10 Minor : 50 Insignificant



Please bear in mind that these are indicative and that the best solution is for the test manager and other members of the project team to determine the levels between them.

Monday, 2 June 2008

Severity vs Priority

When raising a defect, there is a common confusion that occurs for testers and others alike. What is the difference between a defects severity and its priority?

So let’s start with looking at the dictionary definitions:
Severity - Causing very great pain, difficulty, anxiety, damage, etc.
Priority - Something that is very important and must be dealt with before other things.

We can see that the two words have completely different meanings. Why then is their confusion between them?

The severity is the domain of the tester and they should be capable of recording this. The severity to the testers is the impact of the defect on the application and their ability to continue testing. The priority is the domain of the business and should be entered by them against each defect raised to reflect the importance of the change to them.

For instance, a spelling mistake would be deemed as a low severity by the tester, but if this mistake occurs in the company name or address, this would be classed as high priority by the business. An inability to access a rarely used menu option may be of low priority to the business, but the severity is high as a series of tests cannot be executed, all dependent on access to the option.

The mistake that we have seen made many times is to assume that the tester is also capable of recording the priority. Whilst it may be possible for the tester to make an educated assessment, the priority is the business’ means of defining what must be repaired prior to release to production and the order in which effort should be applied to the fixing of defects. Testers who have been involved with a particular application for some period of time may be able to do this, but it is essential to have adequate business representation on the project and their involvement in the life-cycle of a defect and the defect management process.

When a project enters test execution, the focus will be on fixing defects of the highest priority. This means that the application will be released with the minimum amount of priority defects unresolved. Care should be taken by the Project Manager to ensure that whilst the priority is paramount, severity is not ignored. What is needed is a balanced approach, which favours the business priority. At the end of the project the volume of high severity and high priority defects should have at least been reduced, if not removed, in order to meet the exit criteria defined in the test strategy.

To summarize:
Priority = Business = Order of Fixing
Severity = Tester = Failure of Application

Saturday, 31 May 2008

Components of a Bug

Legs, body, head, eyes, mouth; or are we talking about software bugs? The bug, error, defect; it little matters what it is called, but some are more touchy about the subject than others and like to use more politically correct statements, like issue or observation. The reality is that during the testing of an application or piece of software, something is identified as not performing in the expected manner, as driven by experience or indeed by the requirement specification, functional specification or design documents.

Call it what you will, we will use the term defect. Ensuring that you capture the right information at this point is critical. From a testing and development perspective, it is essential to be able to reproduce the defect at a later date, either as part of the remedial process or proving that a remedy has worked. TCL India would recommend that the following points are recorded for each defect:

· Unique defect identifier – a unique reference by which the defect can be identified.
· The application name or identifier and version – the software in which the defect was located.
· Environment specifics – the environment that was being used to test the application.
· Test script identifier (if applicable) – A unique reference from the test script, enabling each defect to be identified by script.
· Defect synopsis – A brief description of the defect that has been encountered.
· Detailed description of Defect – Full definition of the defect, enabling it to be reproduced by developers or those trying to resolve it.
· Test Steps Executed – from the test script, details of the steps executed and the detail of the step that has failed
· Expected Result for Test Step – The expected results for the step, e.g. the displayed logo should have been blue and white
· Actual Result for Test Step – The actual results encountered, e.g. the displayed logo was red and white
· Evidence of defect – Additional information showing the defect, such as screen shots
· Severity estimate – The impact of the defect on the ability of the tester to complete testing
· Priority – The importance of resolving the defect to the organisation
· Tester name – The name of the tester who has reported the defect
· Test date – The date that the tester located the defect
· Defect reporting date – The date that the defect is located. This should be immediate
· Defect assigned to – Who is being asked to resolve the defect

Each time responsibility for a defect is passed to another party, that fact should be recorded to form a history. The value becomes obvious when investigating why certain defects may not have been resolved in a timely manner. Investigation may be required as to why defects are bouncing backwards and forwards between different people, or those which are with an individual or team for a long period of time, impacting on the defect fix turn around time, potentially breaking SLAs.

In some more advanced tools used for defect management you will be able to prescribe the life-cycle of a defect. Such as:
-Raised by the tester
-Passed to the business analyst to prioritise
-Passed to the environment manager for specification of the environment and ensuring the defect was not caused by environmental issues
-Then onto development to fix code
-Back to the tester for re-testing
-Then onto the test manager or defect manager for closure.

The key then is to report on the defects on a daily basis during test execution, keeping the project informed of the number of defects raised and closed that day and the resulting cumulative totals. This enables the Project Manager to make decisions on the project's likelihood to go live on time, whether to apply more resources to certain aspects of the projects, whether overtime is required etc.

Care should be taken not to raise the same defect over and over again. When volumes of defects are high it is worth employing a defect manager to ensure that defects are not being repeatedly raised, wasting the time of resources. The defect manager should also ensure that all defects are being progressed. Sometimes defects that have been remedied are re-introduced erroneously: this is usually symptomatic of poor configuration management.